Swimming pool liner replacement, Tavira, Algarve, Portugal
Swimming pool liner replacement, Tavira, Algarve, Portugal
An old prefabricated panel pool needing a replacement liner. The original 20 year old liner was looking a bit worse for wear and the skimmer bucket had broken due to ground movement.
The owner took the opportunity to tackle all of these jobs at the same time, to leave the swimming pool looking like new.
The replacement of a reinforced pool liner like this takes one of our highly experienced teams just 2 days.
The first stage is to remove the old swimming pool liner, then inspect the fittings to see if any of the plates, gaskets or part of the fitting installed in the pool have been damaged.
The floor of the pool is cleaned, the top profile is fixed in place, then the welding of the reinforced swimming pool membrane can start.
The finish here is the Carrara from the AlkorPlan 3000 range, with contrasting white non slip treads.
If you are considering renovating your swimming pool, the best time of year to do it, is Autumn or Winter, when you are not using the pool. Try not to leave the work until 2 weeks before your guests arrive! The installation of the replacement reinforced pool liner is quick to complete, but every swimming pool is different and sometimes there are hidden surprises. Then there can be other delays beyond our control, so don’t put it off, ask for a quote today.
We install reinforced swimming pool liners throughout mainland Spain and Portugal, with an unrivalled reputation for quality. Contact us today for a no obligation quote and make your swimming pool look as good as this one.
I have a 8 x 4 x 1.5m pool. No steps, no curves, just a simple box of those dimensions. It’s a tiled pool that is old and the tiles keep becoming loose and fall off. Can a liner be installed over a tiled pool? The pool is in Corte Antonio Martins in Tavira province. Can you give me a quote to repair the pool? If you need to visit the pool I can arrange through an agency. http://www.Smartavillas.com