Renolit Carrara swimming pool liner installation. Almeria
Renolit Carrara swimming pool liner installation. Almeria
The installation of a reinforced swimming pool liner from Renolit is the best way to renovate and waterproof a leaking swimming pool. The written 10 year warranty from the manufacturer gives the home owner peace of mind that the job is done properly.
We find many pools that have been poorly built. Often pools have been built from blocks with no reinforcing and then tiled. This method of construction will always fail. If you build an extension is this way, there is no problem, worst case some hairline cracks. Build a pool this way and the huge forces of the water crack the structure and the water leaks out. If the pool fails in this way, retiling will not work, as the structure is not strong enough.
Even well built concrete pools can crack, because of ground movement or leaks that have been left unrepaired.
The Renolit AlkorPlan membrane is 2 layers of strong PVC, with polyester mesh sandwiched inside. It remains permanently flexible and will not rip or tear.
The installation of the liner for a swimming pool like this takes between 2 and 3 days, with very little mess. The first stage is to break out the existing fittings, such as the pool lights, jets, drain etc and install liner compatible fittings. Liner fittings a series of screws to hold the liner in place and make a waterproof seal. These stainless steel screws are then hidden under a cosmetic cover. After this, the top profile is fixed into place, just below the pool surround. The walls are installed first, then the floor afterwards.
For this pool, we used Renolit AlkorPlan 3000 CARRARA with contrasting white non slip treads on the steps.
The best time to repair a swimming pool is when you are not using it, in autumn and winter. So ask for a no obligation quote today and get your pool looking stunning and leak free before the visitors arrive in the spring time.